Bathroom Installation

Project Description

A burst pipe over Christmas caused damage to the plasterboard wall and floorboards for this customer. The room was stripped bare and new moisture resistant plasterboard and flooring installed before being full tiled.

  • Chrome towel radiator
  • Thermostatic mixer shower
  • Ceiling cladding with chrome inserts
  • Chrome down lights

Alex came recommended from a friend my full bathroom was transformed in 1 week. I have recommended him to all of my friends and will defiantly be using him again in the future.
Mrs M. Kilwinning

Photo Gallery

Back to Past Projects

Contact Us Now

Tel: 07818065711 Email: info@plumb-in.com

Gas Safe RegisteredPlumb-in is Gas Safe Registered
(505197)